Deshuttering period relates to the maturity of concrete and depends on the ambient temperature. Forms shall not struck until the concrete has reached strength at least twice the stress of which the concrete may be subjected at the time of removal of form work. | ||||||||||||
Assuming standard conditions of workmanship and quality of materials, you can refer to the following time-frames for the removal of forms.
|